Show Form
Can’t find it? Try A-Z

Information for:

Sign up to our Engage eNewsletter

2018-2020 Strategic Plan

Closing date: 1 September 2016

We are currently consulting on the development of our 2018-2020 Strategic Plan. 

A key input into the process will be the views of our key stakeholders, most notably the professional engineering institutions, who, through a process of consultation, will be asked to identify those issues they consider should be addressed over the three-year period.

The intention is to feed in the responses to the consultation into the EngC Board Retreat in September 2016 from which an initial draft of the Strategic Plan will start to develop. Please note the issues highlighted in the body of the paper are meant to be indicative rather than complete.

To view the proposed draft guidance: 

 Introductory Letter from CEO

 2018-2020 Consultation Paper 

Alternatively, responses can be sent either by email to pbailey@engc.org.uk by 1 September 2016, or by post to:

Paul Bailey
Engineering Council
5th Floor, Woolgate Exchange
Basinghall Street
London
EC2V 5HA

 

Print this page